Closing traffic on the bridge in 2018
The last bridge analysis carried out in 2017 by the research center "Mosty", established that after 61 years of use the bridge structure has accumulated a significant amount of injury that reduces the durability of the structure.
The SIC "Mosty" proposed a set of recommendations for extending the lifespan of the bridge structure.
From January 12 to 14, the traffic was completely blocked due to a drop of temperature. This led to partial destruction. The further bridge maintenance wasn’t possible.